Try, learn and adjust
Check management routines are being used
- Plan: Ravi, a plant manager, works with consultants visiting fifteen days per month for four months.
- Try: Introduce floor organisation, defect logs, maintenance, incentive pay and daily performance meetings alongside plant staff.
- Learn: Review daily metrics and routines: are defects recorded, maintenance scheduled and bottlenecks assigned for action?
- Adjust: Keep routines that staff are using. Change implementation support where gaps remain during the consulting period.
Illustrative: Ravi is fictional. School’s suggested learning loop, not the source study’s tested protocol.
See source →School's suggested, untested loop: observe practice use and operational records; the loop does not isolate effects of individual practices.
How
When to use
Manufacturing firms in developing countries often understand operational concepts in theory but fail to implement basic practices on factory floors. Factory managers need hands-on assistance to establish organized routines, defect tracking, and maintenance schedules. Providing four months of intensive implementation consulting guides plant staff through adopting modern management techniques.
Deploy experienced consultants to work alongside plant staff fifteen days per month over four months to implement core operational practices.
- Assign senior consultants to spend fifteen days per month inside each treatment plant for four consecutive months.
- Direct consultants to work directly with plant personnel on the factory floor to establish physical organization and cleaning routines.
- Assist plant staff in setting up daily defect logs categorized by error type.
- Establish scheduled preventative maintenance routines for all factory machinery.
- Introduce incentive pay schemes to motivate worker attendance and efficiency.
- Train managers to hold daily meetings to review performance metrics and resolve operational bottlenecks.
Why it works
Daily practice coaching ensures new routines become permanent operational habits.
Example
Specialized consultants worked in twenty-eight textile plants across seventeen firms near Mumbai, India, spending four months implementing thirty-eight standard management practices.
About the study
Participants
Seventeen large textile manufacturing firms with twenty-eight factory plants near Mumbai, India, averaging 270 employees, US$13 million in assets, and US$7.5 million in annual sales per firm.
Study Design
Randomized controlled trial evaluating an intensive four-month consulting intervention (fifteen days per month) against control plants receiving only an initial diagnostic.
Results
Intensive implementation consulting led to a 50 percent reduction in quality defects, a 9.4 percent increase in plant output, a 16.6 percent increase in total factor productivity, and an estimated annual profit increase of US$325,000 per plant.