Try, learn and adjust
Use daily meetings to address production delays
- Plan: Meena brings managers, supervisors and production staff together, with consultants guiding initial meetings.
- Try: Review loom efficiency, attendance and downtime records each day.
- Learn: Read the figures together: which bottlenecks or delays are recorded?
- Adjust: Change daily production schedules to address recorded delays. Keep reviewing those delays at the next meeting.
Illustrative: Meena is fictional. School’s suggested learning loop, not the source study’s tested protocol.
See source →Observe daily efficiency, attendance and machine downtime. School suggests this learning loop; it is not the source’s tested procedure.
How
When to use
Factory floors often operate without regular communication between plant managers and production staff regarding output metrics and efficiency losses. Plant managers review performance informally or reactively rather than analyzing daily operational data with floor supervisors. This method helps factory leadership establish structured daily review meetings with production teams to address efficiency bottlenecks immediately.
Hold daily review meetings between managers and production teams to evaluate factory efficiency data and adjust operational routines.
- Assign consultants to attend initial daily meetings to guide managers on structuring production discussions.
- Gather plant managers, floor supervisors, and production staff on the factory floor every day.
- Review daily efficiency data collected from loom tracking logs and machine records.
- Discuss specific operational bottlenecks, weaver attendance, and machine downtime during the meeting.
- Provide immediate manager feedback and adjust daily production schedules to resolve identified delays.
Why it works
Initial consultant participation establishes proper meeting structure and provides feedback so managers can run future review sessions effectively.
Example
International consultants helped plant managers in woven cotton textile firms near Mumbai, India establish daily production efficiency meetings, increasing adoption of daily efficiency meetings with production teams by 78.6 percentage points in treatment plants.
About the study
Participants
28 plants across 17 large, family-owned cotton textile weaving firms in Tarapur and Umbergaon near Mumbai, India, averaging 273 employees and $7.45 million in annual sales per firm.
Study Design
Randomized controlled trial providing 11 treatment firms with 5 months of management consulting and 6 control firms with 1 month of diagnostic consulting, collecting weekly machine log data across ~100 weeks.
Results
Introducing daily efficiency meetings alongside other operational practices contributed to a 9.4% increase in factory output (p = 0.026) and a 16.6% increase in total factor productivity (p = 0.061), raising daily efficiency meeting adoption in treatment plants from 16.7% to 95.3% (a 78.6 percentage point increase).