Extracurricular Non-Crowding Delivery

Download image · 1200 × 630 PNG

In Simple Words

Think of adding an extra passenger to a crowded train car: if you push them into a full row, someone gets kicked out of their seat; but if you place them in an empty vestibule reserved for unstructured waiting, everyone keeps their original seats while gaining extra transport capacity.

Fourth graders in 16 Istanbul schools

Usual school activities
Comparison group
Grit curriculum
Higher math test scores

Sample B, January 2016: gain of 0.28 standard deviations. Lessons used extracurricular slots; scheduling was not separately tested.

See source →

Research question

Introducing new skill-building programs into public school systems often fails or degrades core academic instruction by displacing scheduled hours reserved for mathematics, science, and literacy.

Participants

106 classrooms across 52 state elementary schools in Istanbul, Turkey.

Study Design

Delivery of a 10-to-12-week (minimum 10 sessions, ~2 hours/week) grit program during official 5-hour/week free/extracurricular slots authorized by the Ministry of Education.

Results

Zero reduction in baseline teaching hours for core subjects occurred, while standardized math scores increased by 0.28 standard deviations (p = 0.008) and Turkish scores increased by 0.13 standard deviations (p = 0.027) without crowding out academic instruction.

Takeaway

Schedule non-cognitive intervention modules strictly within Ministry-designated discretionary or free play hours to prevent displacement of core academic instructional time.

Source and citation

See source →

Read alongside the research

Plain-English glossary

Original explanations, informed by the references below. Examples are illustrations, not data from the studies above. The research text stays unchanged.

Baseline

The starting measurements in a study. Researchers use these to compare what participants were like at the start with what happens later.

ExampleBefore a training programme starts, researchers measure workers’ earnings. That first measurement is the baseline.

GET-IT glossary · Baseline characteristics ↗Read more about baseline →

Related findings