Try, learn and adjust
Check defects and their causes
- Plan: Ravi, a factory worker, inspects production items for defects.
- Try: Record defects in daily logs. Managers analyse causes and maintenance teams correct machinery or process errors.
- Learn: Read subsequent defect logs: do the same errors still appear?
- Adjust: Keep corrections where errors no longer appear; change the response where defects persist.
Illustrative: Ravi is fictional. School’s suggested learning loop, not the source study’s tested protocol.
See source →School’s suggested loop, not a tested source procedure. Observe recorded defects and their causes; do not assume the source’s reduction will recur.
How
When to use
Large manufacturing plants in developing countries often lack systematic quality tracking. Production defects persist for long periods because workers do not log or analyze errors. This method helps plant managers identify defect root causes and increase labor productivity.
Implement quality defect measurement and data analysis systems on manufacturing production floors.
- Factory workers inspect manufactured items for defects on the production line.
- Production staff record every identified defect in daily quality logs.
- Plant managers analyze defect logs to isolate operational root causes.
- Maintenance teams correct the underlying machinery and process errors quickly.
Why it works
This eliminates the need to spend large amounts of labor repairing spoiled goods.
Example
Large Indian textile plants had no quality measurement systems, causing defects to linger. Introducing defect tracking allowed managers to fix causes quickly and reduced average defect levels by over 50 percent in three months.
About the study
Participants
Large Indian textile manufacturing plants with a median capital asset value of 13.3 million dollars.
Study Design
Randomized controlled trial comparing plants receiving five months of extensive management consulting against control plants receiving one month of light consulting.
Results
Adopting systems to measure and analyze quality defects reduced average defect levels by over 50 percent in the first three months.