Try, learn and adjust
Check voluntary targets and pay
- Plan: Offer Meena a binding target the evening before work; allow zero for standard pay without penalty risk.
- Try: Record her choice and accurate fields. Pay Rs. 0.03 per field if she meets the target; otherwise Rs. 0.015.
- Learn: Compare Meena’s chosen target, accurate output and pay: was her choice recorded and the rate applied correctly?
- Adjust: Keep accurate recording and pay checks for the next workday. Correct errors while preserving voluntary target choice.
Illustrative: Meena is fictional. School’s suggested learning loop, not the source study’s tested protocol.
See source →School’s suggested, untested loop. Observe chosen targets, output and net earnings; do not assume Meena achieves the study average.
How
When to use
A firm wants to give employees a stronger commitment tool to overcome workplace procrastination and increase daily earnings. Workers setting goals on the morning of work may still experience present bias as the shift begins. Selecting binding targets the evening prior locks in commitment before daily production uncertainty and temptations arise.
Allow workers to voluntarily choose their binding daily production target the evening prior to the workday.
- Present workers with the option to set an explicit data entry target for the following day before leaving work in the evening.
- Permit workers to select a target of zero if they prefer standard piece-rate compensation without penalty risk.
- Record the binding production target chosen by each participating employee.
- Track total accurate data fields completed by each worker during the subsequent workday.
- Pay the standard piece rate of Rs. 0.03 per accurate field if the worker reaches or exceeds the evening target.
- Reduce the piece rate to Rs. 0.015 per field if the worker falls short of the evening target.
Why it works
This prevents present-biased preferences from causing workers to set lower goals or slack off during the work shift.
Example
A data entry firm in Mysore, India allowed 102 workers to select binding production targets the evening before the workday. Choosing targets the evening prior under production uncertainty increased worker net earnings by 3 percent.
About the study
Participants
102 data entry workers in Mysore, India.
Study Design
Randomized controlled trial offering workers rotating 8- to 12-day contract treatments, including the choice the evening prior to set a binding target with a 50 percent piece-rate penalty for missing it.
Results
Selecting production targets the evening prior increased worker net earnings by 3 percent relative to baseline, even when production uncertainty was higher.